End of day 1 setting up at Chelsea, very tired but got lots done.
The walls are up, but we had to rearrange the sections as the plot was 50cm wider and the soggy mud meant that the walls had to be put on blocks of timber to keep them dry.
My storage cupboard is fixed together and my decking in place which also is sitting on blocks to keep it out of the mud.
Tomorrow sees the sculpture, plants and Chipping’s going in. Hopefully it won’t rain!